Construction Project Scheduling and Control

Construction Project Scheduling and Control
Saleh A Mubarak
RRP:
NZ$ 243.99
Our Price:
NZ$ 207.39
Hardback
h231 x 190mm - 592pg
3 Sep 2019 US
International import eta 10-30 days
9781119499831
Out Of Stock
Currently no stock in-store, stock is sourced to your order
Ensure successful construction projects through effective project scheduling and controlThe success of a construction project is dependent on a schedule that is well-defined yet flexible to allow for inevitable delays or changes. Without an effective schedule, projects often run over budget and deadlines are missed which can jeopardize the success of the project. The updated Construction Project Scheduling and Control, Fourth Edition is a comprehensive guide that examines the analytical methods used to devise an efficient and successful schedule for construction projects of all sizes. This Fourth Edition describes the tools and methods that make projects run smoothly, with invaluable information from a noted career construction professional. Construction Project Scheduling and Control, Fourth Edition offers construction professionals a redefined Critical Path Method (CPM) and updated information on Building Information Modeling (BIM) and how it impacts project control. This Fourth Edition includes worked problems and scheduling software exercises that help students and practicing professionals apply critical thinking to issues in construction scheduling. This updated edition of Construction Project Scheduling and Control:* Includes a revised chapter on the Critical Path Method (CPM) and an all-new chapter on project scheduling and control as viewed through the owner's perspective* Provides numerous worked problems and construction scheduling exercises* Includes an expanded glossary and list of acronyms * Offers updated instructor materials including PowerPoint lecture slides and an instructor's manualWritten for undergraduate and graduate students in construction management, civil engineering, and architecture, as well as practicing construction management professionals, Construction Project Scheduling and Control, Fourth Edition is updated to reflect the latest practices in the field.

In stock - for items in stock we aim to dispatch the next business day. For delivery in NZ allow 2-5 business days, with rural taking a wee bit longer.

Locally sourced in NZ - stock comes from a NZ supplier with an approximate delivery of 7-15 business days.

International Imports - stock is imported into NZ, depending on air or sea shipping option from the international supplier stock can take 10-30 working days to arrive into NZ. 

Pre-order Titles - delivery will vary depending on where the title is published, if local stock is available in NZ then 5-7 business days, for international imports it can be 10-30 business days. In all cases we will access the quickest supply option.

Delivery Packaging - we ship all items in cardboard sleeves or by box with either packing paper or corn starch chips. (We avoid using plastics bubble bags)

Tracking - Orders are delivered by track and trace courier and are fully insured, tracking information will be sent by email once dispatched.

View our full Order & Delivery information